To qualify for a plan check for your ADU, plans are to be prepared and the following 4 steps are to be completed.
STEP #1 – City of Oxnard Planning Division requires that all ADU permits first get issued an ADU Zone Clearance. To apply for a planning ADU Zone Clearance, click here.
STEP #2 – After an ADU Zone Clearance is issued, provide a complete ADU Building Plan Submittal Package. Once a complete submittal package is assembled the person who prepared the plans should fill out the checklist below.
STEP #3 – Completely fill out a City of Oxnard Building Permit Application. Be sure to fill out all applicable sections, if a section does not apply write N/A in that area.
STEP #4 – Once all previous steps are completed submit your completed:
- Building Permit Application
- ADU Plan Submittal Checklist
- 3-sets of full-size plans + 2-sets of Title 24 energy calculations
Submit to Building & Engineering, 214 South C Street Oxnard CA. Staff will review the construction plans to make sure they align with the approved ADU TYPE CLEARANCE and plans to verify compliance with applicable standards. Plan check fees will be determined based on project scope and will be determined at the start of the building submittal process.
DISCLAIMER
Building and Engineering may determine a project is not eligible for review based on site conditions, project scope, non-permitted construction, or other project conditions. The applicant acknowledges that approval from the City of Oxnard Planning Division is required prior to plan submission.